Delivered by LINZ

e-survey Forum

Share ideas, comments and feedback about e-survey and survey regulations with others in the survey community. If you have a query about e-survey or Landonline, LINZ will make every effort to provide you with a response.

Welcome Guest Search | Log In | Register

e-survey Forum » Members » rlowe001
Profile: rlowe001
WWW
About
User Name: rlowe001
Forum Rank: Member
Real Name:
Organisation Connell Wagner
Occupation:
Interests:
Gender: None Specified
Statistics
Joined: Friday, May 25, 2007
Last Visit: Friday, May 25, 2007 9:06:23 AM
Number of Posts: 1
[0.34% of all post / 0.00 posts per day]
Avatar
Last 10 Posts
Topic: Plan generation: Appellation labels automatically shifting
Posted: Friday, May 25, 2007 9:06:01 AM
If it is necessary to make a minor change within the traverse/boundary capture after plan generation is substantially complete, LoL will require you to re-link a parcel. As part of plan gen it may be necessary to move the parcel label within layout sheets so that it is central to the lot (eg for a rear allotment with a 'leg in strip').

When the parcel is re-linked as part of parcel capture, the parcel label also needs to be moved in the spatial view so that it is positioned in the middle of the allotment. However when you go back into plan generation, the lot label has moved by the same distance it was shifted in the spatial view, which means it could be way outside the lot.

This is extremely frustrating, especially if you've spent hours or days checking the plan and all you're doing is making minor amendments.

Has anyone else experienced this issue before or are we doing something silly?
Back to top