UNIT DEVELOPMENT PLAN SUFFIXESStaged unit development plans are assigned letter suffixes to distinguish between the stages of the plan that all have the same LT or DP survey number. Landonline automatically assigns suffixes on creation of the survey header and maintains the suffixes as various stages are processed from allocation of the number through submission, approval and deposit. The suffixes are allocated so as to meet the following requirements:
For this automated suffixing system to work correctly, it is important the surveyor correctly identifies the type of survey (PUD, 1st stage, Substituted PUD, Unit Stage, Final Stage) at the time that the survey header is completed and a plan number is allocated. It is also imperative that no suffix is entered in the 'Previous Unit Plan Stage' field. This field should only contain the LT/DP number (i.e. DP 12345). If an error is made in this part of the process, it is extremely difficult to resolve the resulting problems. |