CAPTURED DATAPrimary Boundary DataAn interim capture option in Otago, Southland and Canterbury for some paper surveys lodged into Landonline (including Work in Progress surveys) was to capture only boundary dimensions for primary parcels. This meant not capturing traverses or dimensions of non-primary parcels. In some isolated cases, a few traverse lines were captured in order to hold different parts of a survey together. The data available for Primary Boundary Data surveys is:
Captured Data Capture Data Standards Basic Survey Data Survey Conversion Data Graphical Plan Data Primary Boundaries and Traverse Data Full Capture Data Variations to the Capture Standards |